What's the plinth area? How much cement is required? How much sand is required? How many truckloads of bricks and stones are required? What structural materials are required to construct the building? What other materials are required? What should be the ratio of the admixture? What type of iron bars is required? What are the specifications of each bar? What is the area of the city/county/district? How many four-floor buildings are there? How many buildings are there that are more than four floors? What are their dimensions? Where is the proposed location of this building? Where is the tallest building within a 35km radius of this location? What kind of building foundation is there? How many feet below the ground does that foundation go? What materials were used in the construction of that building? How many total iron bars were used? How much of each type of material was used? What are the specifications of each item? Are there any soil tests required before the foundation is poured? What are some of the common soil tests practised around the world? What type of building foundation do you propose? Where have similar building foundations been utilised? What is the location of that building? What kind of building foundation is there? How many feet below the ground does that foundation go? What materials were used in the construction of that building? How many total iron bars were used? How much of each type of material was used? What are the specifications of each item? Can you bring me up to date? What do you think? How many total units are there? 184 1) 13 Unites + 13 Unites = 26 Unites, Electric room, Laundry room, Garbage room, Boiler room, Storage, Bike room, Social service room, Elevator room, Manager's room. Janitor's closet, Bath room common, Social service room, Activity room, Pump room. Lounge with gas room, rest room, laundry room, Boiler room, Garbage room, Electric room. Total 46 2) 23 (2 facing front 2 facing sides, 9 North side, 10 south side) + 23 (2 facing front 2 facing sides) = 46 Units, Elevator space, Janitorial space, Stairs space 3) 4) Grand Total = 184 Units = 164 U shaped building What is the length, breadth, and height of each unit? Units Length/breadth/height 16 feet/ 10 feet/ 8 feet Unit Doors Length/breadth 6 feet 7 inches/ 2 feet 8 Inches Unit Windows Length/breadth 4 feet 11 inches/ 3 feet 8 Inches Unit Sinks 1 feet 9 inches/1 feet Bath rooms Length/breadth/height 5 feet/ 4 feet 11''/ 8 feet Bath room doors 6 feet 7 inches/ 2 feet 4 inches Sinks 1 feet 6 inches/1 feet 4 inches Bathtubs Mirror Toilets Faucets Shower Tiles Cupboard Kitchen Corner Shelf Length 3 feet 4 inches Breadth 2 feet 1 inch Height 3 feet. Towards door length 3 feet 6 inches What are the dimensions of the lounges, stairs, elevators, and other facilities? Building Elevator system Length/breadth/height 5 feet/4 feet/______ Corridors Length/breadth/height 230 feet + thickness of each wall + 4 feet 7 inches(adjacent to elevator and stairs)____/4 feet 7 inches/ 8 feet Stairs (Space) Length/breadth/height /6 feet 9 inches?/ Stairs steps, Style What will be the depth below ground? What is the height? What is the location? What are the four adjacent streets? What is the postal code? What is the exact latitude and longitude? What is the location on the map? What is the name of the district, the city, and the state? What is the maximum length and width of the building? What is the height of the roof? What is the Foundation type, Facade system, Facade materials, Facade colors, Roof system, Footprint? Who are the partners? What are the terms and conditions of the partnership? What is the height of the top roof? When will the construction start? When will the construction end? What is the intent for the main use of this building? What is the additional uses of this building? What is the height from floor to floor? What will be the dimensions of each pillar? How many work places will be there in the building ? What type of construction will it be? What is the architectural style? What will be the mechanism, the design of the electricity system, the emergency lighting system, the water supply system/boiler, the firefighting system, the elevator system, the monitoring system, the janitorial system, the parking system, the laundry system, the vending machine system, the sewage system, and the telephone system, the building cooling/heating system, the Wifi system/Dish? |
Location Address * Bordering street #1 _______ Bordering street #2 _______ Bordering street #3 _______ Bordering street #4 _______ Postcode * Exact Latitude * Exact Longitude * Location Map (POI) * (Probable locations, Atlanta, Saudia Arabia, Delhi, Bangalore, Mumbai, Karachi, etc) Neighborhood District City State Technical Data Height (tip) * Height (struct.) 53.7 ft Height (roof) * Height (main roof) * Height (top floor) * Height (obs. floor) * Length (max) * Width (max) * Floors (OG) 4 Floors (UG) * Floor overview * Construction start * Construction end ____ GFA * Height Floor-to-floor * Building Electricity system Building Emergency light system Building Water supply (plumbing) system/boiler Building Fire fighting system Building Escalator system Building Elevator system Building Gas service system Building Monitoring system Building Janitorial system Building Parking system Building Laundry System Building Vending machine System Building Sewage system Building Telephone system Building Cooling/heating system Building Wifi system/Dish Building Stairs Building Lounge Work places * Building in General Type of construction high-rise building Structural system Structural materials Foundation type Facade systems Facade materials Facade colors Roof system Floors, Walls, and Ceilings Ventilation Footprint type Main usages Side usages Architectural style Status under progress. Other builders, business, railways, Administrative parties http://www.greatbuildings.com/buildings.html To be updated |